Home> Products> Tunnel Lining Formwork> Highway Tunnel Trolley> Tunnel lining trolley formwork system
Tunnel lining trolley formwork system
Tunnel lining trolley formwork system
Tunnel lining trolley formwork system

Tunnel lining trolley formwork system

Get Latest Price
Payment Type:L/C,T/T
Incoterm:FOB,CFR,CIF
Min. Order:1 Set/Sets
Transportation:Ocean,Land
Port:Dalian,Qindao
Product Attributes

BrandLijian

MaterialSteel

MOQ1 Set

CertificationOther

Surface TreatmentPainted Or As Customer Requirement

DesignProvided By Li Jian

ToleranceGB Or As Customer Requirements

ApplicationBridge Engineering

TypeBridge Formwork

Packaging & Delivery
Selling Units : Set/Sets
Package Type : According to customers request
Product Description

Working Principle of Tunnel Lining Trolley


  1. Higher recycling rate: The gantry system, running system, support system, electrical system and Hydraulic Formwork system of a set of trolleys can be increased from one original to several times.
  2. Faster assembly speed: A large number of pin connections are used instead of bolt connections, and the assembly efficiency is increased by 30%.
  3. Faster delivery speed: Pre-production can be achieved, and the delivery speed is shortened from 30 days to 7 days.
  4. Higher installation accuracy and strength: Standardized production, higher precision pin joint structure, a large number of replacement steel structures in the skeleton support system with pipe structure, ensuring a higher degree of installation dimensional accuracy and a more stable force. structure.




Stainless Steel Roller Chain




product feature:

* Tunnel Trolley is widely be used in concrete construction of all kinds of special-shaped structures.
The product is easy to use and flexible to disassemble.
More times turnover, low cost amortization.
The appearance of concrete is well quality.
Save labor cost and reduce project cost.



Advantage:

● light weight; 
● simple, strong and stable structure; 
● moved, mounted and stripped easily; 
● strong reusability; 
● small deformation under force; 
● adequate space under traveler and providing a big space for bars and formwork construction operation.



Formwork


Value-added services:
Provide construction plan for civil engineering and cooperate with Bidding for Party A.
Provide early product design and the most cost-effective scheme.
After sales service and technical support during construction.
Free product improvement scheme.


Bridge Concrete Formwork

Home> Products> Tunnel Lining Formwork> Highway Tunnel Trolley> Tunnel lining trolley formwork system
Send Inquiry
*
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send